Gabriela E2C: Power and Operational Precision at the Lo Ruiz Tunnel 💪
At Dukraft, we continue to set the standard for complex project execution. We introduce our Gabriela E2C drill rig, high-performance equipment already in operation and redefining productivity standards at the Lo Ruiz Tunnel in Renca.
Specifically designed for critical environments, the Gabriela E2C combines cutting-edge technology with robust operability, guaranteeing steady excavation progress and ensuring the integrity of every maneuver.
Key performance features on-site:
✅ Unmatched Performance: Precision engineering for uninterrupted progress.
✅ Cost Efficiency: Optimized technology to reduce operating costs per drilled meter.
✅ High-Level Safety: Integrated systems for total protection of the operator and the environment.
The Gabriela E2C’s presence at the Lo Ruiz Tunnel is tangible proof that technical efficiency is the driving force of Dukraft Rental. We are ready to transform infrastructure challenges into success stories.

Español
Deutsch