Why choosing Dukraft Rental?

 

Our team of experts and clear commitment to service quality makes us trusted in the market.
Dukraft Rental Fleet of last generation Rigs with Computer Controlled (RCS) or Directs Systems (DCS) with different levels of automation provide superior production rates, significant labor and cost saving and proven reliability.
Our equipment is governed by the highest safety standards, following and exceeding the EPIROC Equipment Safety and Maintainance, Our customers, Chilean and European standards.
When carrying out a mining or infrastructure project, Dukraft Rental provides a complete Service Center at the construction site with critical spare parts and drilling consumables. With an efficient administrative back office this saves costs and problems.
Dukraft Rental is a specialist in drilling equipment. Improve your uptime by trusting our highly skilled technitians and managers to maintain the rigs working.

 

 

 

We will go where ever you need us

Our international presence and flexibility
allows us to serve projects in all Latinamerica

Why choosing Dukraft Rental?

 

Our team of experts and clear commitment to service quality makes us trusted in the market.
Dukraft Rental Fleet of last generation Rigs with Computer Controlled (RCS) or Directs Systems (DCS) with different levels of automation provide superior production rates, significant labor and cost saving and proven reliability.
Our equipment is governed by the highest safety standards, following and exceeding the EPIROC Equipment Safety and Maintainance, Our customers, Chilean and European standards.
When carrying out a mining or infrastructure project, Dukraft Rental provides a complete Service Center at the construction site with critical spare parts and drilling consumables. With an efficient administrative back office this saves costs and problems.
Dukraft Rental is a specialist in drilling equipment. Improve your uptime by trusting our highly skilled technitians and managers to maintain the rigs working.

 

 

We will go where ever you need us

Our international presence
and flexibility
allows us to serve projects in all Latinamerica

Andina-Codelco, Chiquicamata-Codelco

Development works. Ventilation adit.

Alto Maipo Hydroelectric Power Plant

Central Aduction Tunnel Las Lajas, Alto Maipo.

Angostura Hydroelectric Power Plant

Excavation Of Tunnels Of Forwarding And Adduction. Access To Machine Cavern.

Confluencia Hydroelectric Power Plant

Fortification Drilling. Aduction Tunnel.

Tinguiririca Hydroelectric Power Plant

By-Pass. Adduction Tunnel.

Chuquicamata – Codelco

Excavation of Personal and Material Transport Tunnels. Ventilation Adits.

Chuquicamata – Codelco

Excavation of Personal and Material Transport Tunnels.
Ventilation Adits. Development Works

New Level Mine El Teniente – Codelco

Excavation 2 Adit Ventilation Tunnels.

New Level Mine El Teniente – Codelco

Road Tunnels Construction, Maitenes Road – Confluence.

Chamisero Tunnel

Tunnel Excavation Via Chamisero Ii Highway Northeast – Santiago.

Guajes Tunnel, Guerrero – México

Connection tunnel development

El Bagre, Antioquia – El Cordero Mine

Phoenix ramp – Construction of access ramp and control panels.

El Teniente Mine – CODELCO

Main access and ventilation ADIT – New Mine Level

Cañasgordas, Antioquia

Support for the construction of tunnels 3 and 4, Mar 2 Project

Chuquicamata – CODELCO

Tunnel construcción and ventilation chimney

Buriticá Mine, Antioquia

Material loading service.

Andina-Codelco, Chiquicamata-Codelco

Development works. Ventilation adit.

Alto Maipo Hydroelectric Power Plant

Central Aduction Tunnel Las Lajas, Alto Maipo.

Angostura Hydroelectric Power Plant

Excavation Of Tunnels Of Forwarding And Adduction. Access To Machine Cavern.

Confluencia Hydroelectric Power Plant

Fortification Drilling. Aduction Tunnel.

Tinguiririca Hydroelectric Power Plant

By-Pass. Adduction Tunnel.

Chuquicamata – Codelco

Excavation of Personal and Material Transport Tunnels. Ventilation Adits.

Chuquicamata – Codelco

Excavation of Personal and Material Transport Tunnels.
Ventilation Adits. Development Works

New Level Mine El Teniente – Codelco

Excavation 2 Adit Ventilation Tunnels.

New Level Mine El Teniente – Codelco

Road Tunnels Construction, Maitenes Road – Confluence.

Chamisero Tunnel

Tunnel Excavation Via Chamisero Ii Highway Northeast – Santiago.

Guajes Tunnel, Guerrero – México

Connection tunnel development

El Bagre, Antioquia – El Cordero Mine

Phoenix ramp – Construction of access ramp and control panels.

El Teniente Mine – CODELCO

Main access and ventilation ADIT – New Mine Level

Cañasgordas, Antioquia

Support for the construction of tunnels 3 and 4, Mar 2 Project

Chuquicamata – CODELCO

Tunnel construcción and ventilation chimney

Buriticá Mine, Antioquia

Material loading service.

Image Gallery